Transport check tool

Transport check tool

SAP has delivered a new transport check tool. Goal of the check tool is to make sure your imports are done successful. The tool is designed to answer the following questions:

  • Do I import transports in the right sequence?
  • Do I have dependency on other transports, which are not yet imported?
  • Are there objects in the transport also used in other transports, which I should also import now, or when I do later make a downgrade?
  • How long will the import time take?

SAP transport check tool

The transport check tool is a program with name /SDF/CMO_TR_CHECK, or tcode /SDF/TRCHECK. It is delivered in updates of ST-PI component. You can run this program in the normal system or from SAP solution manager.

If you start you get the following initial screen:

Transport check tool overview screen

Here you see that you need 2 RFC’s: one to the source system where the current transports are and one to the target system where the imports will happen.

Tip: make 2 variants for this program. One is called quality import with RFC source is development and target is quality system. Second is called production import with source is quality and target is the productive system.

In the transport details you can enter 1 or more transport numbers you want to validate. Enter in the transport list the sequence of wanted import.

Important for multiple transports: sequence does matter! If you enter transports in sequence A1, A3, A2 this will give different result from A1, A2, A3.

Cross reference check

The cross reference check will take all the objects in the transport and will execute a where used list in the target system and will check their versions. If any strange thing is found in missing items, or potential version conflicts, you will be alerted. If check is ok the list of items will be empty.

Sequence check

The sequence check will check the sequence of your transports if they are in the right order. It will also check other transports as well for containing the same objects, which have not yet been imported to the target system. If any strange thing is found in missing items or potential version conflicts you will be alerted. If check is ok the list of items will be empty.

Import time in source system

This check will add up the import times of the transport in the source system. This will be a good indication for import time needed in the target system. Example: if import to quality system took 2 minutes, you can expect productive import to be about 2 minutes as well. If the import to quality took 2 hours, you might want to decide more carefully on the exact time of import to productive system.

More information

More information on the check can be found by hitting the I (information) button on the program itself. Features of the tool including the PDF explaning the setup of the Online Import Check feature can be found in OSS note 2474491 Transport check report.